Chart 008
The Navigator’s Journal: Observations from leaders navigating AI, strategy, and organizational change.
Chart Your Course
When your team sets a goal for next year, does anyone also agree how you’ll get there?
Most planning sessions stop at the destination. Grow revenue. Bring AI into the workflow. The goals go up on the whiteboard, everyone nods, and the meeting ends before anyone decides how the plan will actually be executed, starting Monday.
At sea, the navigator must think about more than the destination. When planning a passage, speed, time and distance are critical factors not least because they impact your fuel. Then there is identifying the hazards to avoid and areas of traffic where you might consider modifying your watch routines and increasing readiness and even the weather trends for the intended time of year. Without these considerations, the destination becomes a wish penciled on a chart. But is it executable?
That’s where ACES analysis can help. It is a short assessment that can be used to help build clear goals. It asks four questions, in order:
- Achieve: what do we want to achieve?
- Continue: what’s working, including what we’ve already achieved, that we should keep?
- Eliminate: what should we stop doing, because it’s in the way?
- Start: what habits, strategies or new capabilities will deliver the Achieve?
A team can work through it in about an hour with a whiteboard, and it builds the foundations to support an effective passage plan to reach the destination.
Why the Order Matters
Achieve comes first because every other answer depends on it. You can’t judge what to keep or what to drop until you know where you’re heading.
Continue and Eliminate come next. Together they show what the business carries into the next period and what it leaves on the dock. That’s also where you find out how much capacity you really have.
Start comes last, and it has a specific job. Each Start is a habit, strategy or capability that moves you toward an Achieve. If a proposed Start doesn’t serve one of your goals, it’s a distraction, however interesting it looks.
Chart 001 made a similar point about the whole organization: Float before you Move. ACES applies the same discipline to a single planning cycle.
Achieve: Name the Destination
Start by agreeing what you want to achieve over the period ahead. Keep it to no more than four outcomes, written in plain language and specific enough that you’ll know when you’ve arrived. “Cut proposal turnaround to three days by the end of March” is a clear and quantified destination that can be aligned to a process.
“Use AI more” is a direction, at best.
If a goal involves AI, apply the test from Chart 007: describe it without the word “AI”. If it still makes sense, it’s a business outcome worth setting. If it doesn’t, you’re describing a tool you’d like to buy.
This is also where the Captain and Navigator roles matter. Anyone can propose a goal to achieve. A good facilitator lays out the options and the trade-offs. Leadership decides which destinations the business commits to.
Continue: Keep What’s Working
Some things are already working in your business. They rarely get discussed because nothing is wrong with them, which is exactly why they’re at risk. When attention swings to new goals, the routines that keep a business steady may lose their owners one by one.
Continue is where you protect them, and where you take stock of what you’ve already achieved. Look back at last period’s goals. What landed, and what made it land? A win you don’t name is easy to lose. The weekly client check-in that keeps renewals healthy, the prompt library one colleague built, the human review step on an AI process that drafts before anything reaches a client. Write each one down, give it an owner, and agree it stays.
Good habits from earlier Charts belong here too. If your team adopted the usage habits from Chart 002 or the standing orders approach from Chart 006, confirm they’re still being followed.
Eliminate: Clear the Deck
This is the question teams find hardest, and the one that pays back the most.
Every goal draws on the same limited supply of time and budget. A crew can only stand so many watches. When nothing is ever stopped, each new goal gets a thinner share and everything moves more slowly unless the team capacity is increased.
Look for things that cost more than they return, or that pull against what you want to achieve:
- AI subscriptions nobody has opened in a month (Chart 003 called this the AI tool trap)
- Reports produced on schedule and read by no one
- A pilot that has sat at “nearly ready” for two quarters
- Meetings that exist because they always have
Stopping something is a decision, so treat it like one. Record what you’re stopping, why, and who signed off. Anything a client can see may need a wind-down rather than a hard stop.
Start: The Habits That Get You There
With the destination set and the deck cleared, decide what you’ll begin doing to reach it.
A Start is a habit, strategy or capability. It is something the team will actually do, week in and week out. A fifteen-minute Friday review of proposal turnaround. Two short AI literacy sessions for every team member. A shared prompt library, with an owner who keeps it current. Each one should trace back to a specific Achieve.
Keep the list short. Two or three Starts per goal is plenty for most small businesses, because each one needs an owner and time. If a Start involves a new AI tool, run it through the Four Dimension Evaluation from Chart 007 before you commit.
From ACES to Goals
Once the four questions are answered, turning them into goals is quick. Each Achieve becomes a goal, and its Starts become the plan for reaching it.
Here is an illustrative example from a 12-person professional services firm:
| ACES question | What the team recorded |
|---|---|
| Achieve | Cut proposal turnaround from 5 days to 3 by the end of March. Every team member confident using AI on client drafts by the same date. |
| Continue | Human review of every AI-assisted client document. Monthly cost-per-outcome check on AI tools. Last quarter’s win: a reusable proposal template library. |
| Eliminate | Two overlapping AI writing subscriptions. The weekly status report nobody reads. |
| Start | A shared prompt library for proposals, owned by the bid lead. A 15-minute Friday turnaround review. Two short AI literacy sessions per person. |
The firm ended up with two goals, each with its Starts attached and a named owner. The literacy sessions serve both goals, presenting a good sign that they are worth the time. And because the template library sits under Continue, nobody will quietly let it lapse while the new work begins.
Every line on the page connects to something else on it. That traceability is what keeps goals standing when the quarter gets busy.
Running Your First ACES Session
You need 60 to 90 minutes and the people who do the work.
- Leadership proposes the Achieve before the meeting, and the team tests it. Is it clear, and will we know when we’ve arrived?
- Ask each person to write their own answers to Continue, Eliminate and Start beforehand. This keeps junior voices from being drowned out by senior ones, a pattern Chart 005 traced through aviation and bridge team failures.
- Work through the questions in order. Achieve, Continue, Eliminate, Start.
- Capture decisions on one page. Every Start links to an Achieve, and every Continue, Eliminate and Start has a named owner.
- Set a review date and repeat each quarter.
The repeat is where ACES becomes a habit in its own right. Next quarter, what you achieved moves into continue, and the team sets its next destination from a confirmed position. That is Sustain in practice.
Frequently Asked Questions
What does ACES stand for?
Achieve, Continue, Eliminate and Start. It’s a short assessment a team uses to set goals and agree the habits that will reach them.
How is ACES different from start, stop, continue?
It begins with Achieve, so the team agrees the destination first and judges everything else against it. Start then means the specific habits and strategies that deliver those goals.
Where do last year’s results go?
Under Continue. Reviewing what you’ve already achieved shows you what to protect and build on.
How often should we run ACES?
Quarterly suits most small businesses. Run one sooner if something significant changes, such as a lost contract or a major new tool.
Can we use ACES for AI goals?
Yes. It’s especially useful for AI because it ties every new tool or habit to a business outcome, and it prompts the team to retire tools that aren’t serving one.
Chart Your Course
Before your next planning session, write down one thing you want to achieve, then ask the other three questions against it. If you’d like an outside navigator in the room, book a free 30-minute Navigation Call, or take the AI Readiness Assessment to see where your organization stands.
What’s one goal your team has set without agreeing the habits that will deliver it? đź§
AI-assisted: This article was researched and drafted with AI assistance and reviewed by a human before publication.
Not ready to talk yet? Take one of our free AI Readiness Assessments to see where your business stands, or book a free 30-minute Navigation Call.




